March 12, 2026
PC, Mac
Timberborn
Game facts
When is Timberborn coming out?
Timberborn is scheduled to release on Mar 12, 2026.
What are the Timberborn review scores?
Timberborn has an OpenCritic Top Critics average of 86/100 based on 17 reviews.
Which platforms is Timberborn on?
Timberborn is listed on PC (Microsoft Windows), Mac.
Humans are long gone. In a world struck by droughts and toxic waste, will your lumberpunk beavers do any better? Timberborn is a sandbox city-building game featuring ingenious animals, vertical architecture, water physics, and terraforming. Contains high amounts of wood.
Simulator
Strategy
Indie
Single player
Screenshots
86
Top Critics Average
94%
Critics RecommendMankind turned Earth into a dry wasteland and perished, but some species adapted and evolved. Pick one of the beaver factions and see how long your colony can last.
Videos
Artworks